2015 SOLAR FACILITY PROJECT

The goal of the solar power project is to increase the reliability of the electrical power supply to the school campus.

Before – The Need

Less than 5% of students successfully graduate from Suma High school. This is due in part to the unreliable power source. On average, the power to the school is interrupted 50 % of the time. This impacts the ability of students to study after sunset (6 pm), which is when most students have time for school work. Additionally, no computers and other equipment can be utilized during these power outages.

Project Impact

The goal of the solar power project is to increase the reliability of the electrical power supply to the school campus to allow students to have more time to study and to be successful in school

Engineers Without Borders (EWB) is partnering with CLT and is assisting to install a solar facility on the campus. The project is in the final stages of completion.

 

Solar Facility Project

2015 SOLAR FACILITY PROJECT –

2015 SOLAR FACILITY PROJECT –